Webster, NY

This beautiful home on the shores of Lake Ontario had an Oil burning hydronic heating system. ACES-Energy replaced the system with a 5-ton Geothermal water-to-water unit. Trenches were stacked at 10' and 6' for a total of 3200' of 3/4" HDPE.

Loop Field Temperatures

Radiant Floor Temperatures

De-Superheater Temperatures

Supply to/Exit From Hybrid HW Heater

Basement w/ Hybrid HW Heater Cycles

Inside Vs Outside

System Performance (in kWh)

This graph shows kWh of energy production (1 kwH = 3,412 BTU).

Loading...

You can ask us to call or email you: